An IKEA kitchen project can involve cabinet installation, worktop fabrication, electrical work, plumbing and finishing. Those tasks are not automatically included in one installation price. Begin with the current order, room measurements and the written scope from the provider doing the work.
Check IKEA’s current description against your order
IKEA’s United States installation information distinguishes cabinet and other installation tasks from electrical, plumbing and gas connections. Additional trade work can require separate arrangements. Confirm the service available for your address and the terms of your actual booking; a general web page is not your contract.
If using whitepinedb.com or another independent installer, ask exactly which IKEA components they will assemble and install and which items remain with another supplier.
Create a responsibility schedule
| Work item | Question to settle before booking |
|---|---|
| Existing kitchen | Who removes it and disposes of the material? |
| Room preparation | Who addresses uneven surfaces or known defects? |
| Cabinets | Which units, fittings, panels and finishing pieces are included? |
| Worktop | Who measures, fabricates and installs the selected material? |
| Utilities | Who arranges and completes the required connections? |
| Finishing | Who paints, tiles or makes good surrounding surfaces? |
Have the installer identify work that needs a separate qualified trade or local approval. Do not treat a generic “kitchen installation” label as permission for a homeowner to alter gas or electrical services.
Resolve measurements and delivery dependencies
Confirm which final dimensions have been checked and who is responsible for them. Identify the appliances and sinks that affect openings and clearances. Ask how missing or damaged components will be handled and whether they change the visit schedule or price.
Compare additions before authorising them
Request a written explanation of excluded work, allowances and the method for pricing a change. If a problem appears after removal of the old kitchen, pause the affected work until the solution and responsibility are clear. Keep revised drawings and approved changes with the order.
Check the completed kitchen against the scope
Review door and drawer operation, agreed finishes, documentation and any unresolved items with the responsible installer. Have the appropriate trades complete their own checks for connected services. Record defects and the agreed remedy rather than relying on a broad promise that everything is included.