Steps to Doing a Kitchen Remodel

142

You have decided that the kitchen in your home is old and outdated and you are ready for a big change. That means it is time to consider the right steps for completing a kitchen remodel to make the kitchen look amazing in no time. But what are the right steps to get the kitchen remodel done right the first time? Some of the steps that you can use to help handle your kitchen remodel includes:

Tear Out and Demolition

Once you have a good idea of how you would like the new kitchen to look, it is time to tear out and demolish the old. You will need to use this time to get rid of anything that looks worn out and outdated, and anything that you do not plan to keep. This can include the fixtures, flooring, cabinetry, and walls.

While you can choose to do the steps here on your own, it is often best to hire a contractor to come in and do the work. They will know how to get the items removed without harming the gas lines or plumbing that may be hidden underneath some of the items. If you do decide to complete it on your own, you will need to turn off the water before you start.

Do the Rough-In Work

The next thing to work on is the rough-in work, which will include the plumbing and the framing. This is the step that will focus on anything that has to do with the walls or what will be inside the walls. Depending on your goals with the kitchen remodel, it can be as simple as moving the framing in the walls around a new center island.

However, for a larger remodeling project, it could mean that you move the plumbing fixtures feet away from where they originally sat or you add some square footage to the space by adding concrete and expanding it. This is a time consuming step, but the right contractor will make sure that it gets done the right way the first time.

The Inspection

After the rough-in work is done, you will need to get a professional inspection done to ensure that the work is done the right way. In some cases, this just means that you will call the county or the city and then schedule the appointment. It is possible you will need to pay a fee to get it done. If you have taken the time to follow all of the right building codes, then this shouldnā€™t take too long to get done.

The good news is that if you do hire a contractor to do the work, they will be able to handle the inspection and can fix any of the errors that show up in the inspection on their own. If you have done the work up to this point on your own and you did not pass the inspection, then this may be the time where you will need to hire a contractor to help out.

Finish the Walls

Once the renovation project has been able to pass the inspection, it is time for you to finish the walls. This will include the drywall that is necessary for the walls and for the countertop bar if you plan to add that to the kitchen as well. Getting the walls just right can take some time and attention on your part, so you may want a contractor to step in and help here.

This is also the best time for you to add in a coat of primer to the drywall, even though it may be a bit of time before you add in paint. The primer is going to seal the facing paper and will protect it against scrapes and scuffs when you install other items in the room. This can ensure that your walls are going to look amazing for a long time to come.

Cabinets and Plumbing Fixtures

Now it is time for you to add the plumbing fixtures and the cabinets. You can also take a look at installing the new countertops, if you plan to do so, during this step. This can be a fun part of the process because you will finally be able to see the finished project and how it is going to look when it is all done. It may feel slow, but you are getting to the good stuff.

There are a lot of options of what you will be able to work on during this time. It can include the sink, faucet, garbage disposal and any of the plumbing that may need to get fixed before everything is locked in. You will also get all of the cabinets put in place and organized at this time.

The New Appliances

After you install all of the new plumbing fixtures and the cabinets, it is time to add in some of the new appliances. If you are adding in a new appliance, this is the time that you would do it. If there are any luxury items that you plan to add to the area, then this is the time that you or your contractor will be able to add them in too.

By this point, you will notice that the kitchen is starting to take shape. If you are already working with a professional contractor, they probably have a timeline or a checklist to help determine when the project will be done. If you are doing the work on your own, you may need to sit down and make a list of the tasks that still need to be done. But when you get to this point, the project should be looking pretty good.

When you are looking to do a kitchen remodel for your home, it is often a good idea for you to look into the different kitchen remodeling services in your area. This will ensure that you are able to bring in the professionals and get the work done in a safe and effective manner. Rather than trying to handle it all on your own, trust the professionals to step in and provide you with some of the best kitchen remodeling services around. Trust our team to step in and give you the best experience possible with your kitchen remodel.